TM 9-2320-328-13&P-2
0167-1
DRAFT
0167
FIELD LEVEL MAINTENANCE
PRIMER VALVE CABLE REPLACEMENT
INITIAL SETUP:
REMOVAL
1.
Straighten cable wire (1).
NOTE
Note position of cable on bracket prior to removal to ensure proper installation.
2.
Remove two nuts (2), lockwasher (3), four washers (4), two screws (5), cushion clips (6), and cable (7) from
bracket (8).
Discard lockwashers.
3.
Remove screw (9), washer (10), and retainer (11) from lever (12).
4.
Remove cable wire (1) from retainer (11).
NOTE
•
Note routing of cable in pump house prior to removal to ensure proper installation.
•
Remove cable ties as required.
5.
Remove cable (7) from vehicle.
END OF TASK
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HWT2785
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0398, Item 17)
Materials/Parts
Ties, Cable, Plastic (WP 0400, Item 26)
Lockwasher (2)
References
WP 0391, Fig. 18
Equipment Conditions
Manual primer handle removed (WP 0164)
Pump house panel K removed (WP 0339)