TM 9-2320-328-13&P-2
0167-2
DRAFT
0167
INSTALLATION
NOTE
•
Route cable in pump house as noted prior to removal.
•
Install cable ties as required.
1.
Position cable wire (1) on retainer (11).
2.
Install retainer (11) on lever (12) with washer (10) and screw (9).
Do not tighten screw.
NOTE
Install cable on bracket as noted prior to removal.
3.
Install cable (7) on bracket (8) with two cushion clips (6), screws (5), four washers (4), two lockwashers (3),
and nuts (2).
4.
Tighten screw (9).
5.
Bend cable wire (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install pump house panel K (WP 0339)
2.
Install manual primer handle (WP 0164)
END OF TASK
END OF WORK PACKAGE
HWT2785