TM 9-2320-328-13&P-2
0169-1
DRAFT
0169
FIELD LEVEL MAINTENANCE
PRIMER VALVE REPLACEMENT
INITIAL SETUP:
REMOVAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
Tag and mark wires and hoses prior to removal to ensure proper installation.
1.
Remove locknut (1), washer (2), and wire 4065 (3) from stud (4).
Discard locknut.
2.
Remove screw (5), lockwasher (6), and ground wire 4068 (7) from primer valve (8).
Discard lockwasher.
3.
Remove line (9) from elbow (10).
4.
Remove line (11) from elbow (12).
5.
Remove line (13) from fitting (14).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HWT2789
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0398, Item 17)
Materials/Parts
Compound, Sealing, Pipe Thread
(WP 0400, Item 11)
Tags, Identification (WP 0400, Item 23)
Locknut (1)
Lockwasher (1)
Materials/Parts (continued)
Locknut (4)
Lockwasher (2)
References
WP 0391, Fig. 18, 71
Equipment Conditions
Primer valve cable removed from primer
valve (WP 0167)