TM 9-2320-328-13&P-2
0169-5/(6 blank)
DRAFT
0169
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10. Install primer valve (8) on bracket (18) with cradle (20), U-bolt (21), and two locknuts (19).
11. Install cradle (16) and U-bolt (17) on bracket (18) and primer valve (8) with two locknuts (15).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
12. Install line (13) on fitting (14).
13. Install line (11) on elbow (12).
14. Install line (9) on elbow (10).
15. Install ground wire 4068 (7) on primer valve (8) with lockwasher (6) and screw (5).
16. Install wire 4065 (3) on stud (4) with washer (2) and locknut (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Install primer valve cable on primer valve (WP 0167)
END OF TASK
END OF WORK PACKAGE
HWT2790
HWT2789