TM-9-2320-361-10

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

OPERATOR'S MANUAL

DECEMBER 1988

  TM-9-2320-361-10 - Page 213 of 392

TM 9-2320-361-10
2-31. OPERATION OF PIPELINE CONSTRUCTION
MAINTENANCE TRUCKS (Contd)
NOTE
Chain lengths must be the same.
(5)
Lock hook end of boom chains (6) into boom chain bracket (7), thirty links
from hook.
(6)
Install A-frame sheave assembly (5) in trunnion (1), and secure with
retaining pin (2) and two cotter pins (3).
(7)
Install tailboard sheave assembly (11) in rear well with retaining pin (8)
and two cotter pins (9).
(8)
Loosen nuts (13) and (15), unscrew retaining pins (10) and (14), and turn
side plates (12) and (4) 90°.
Wear hand protection when handling winch cable. Broken
wires may cause injury to personnel.
(9)
Pull cable (16) from winch (refer to b. of this para.), wrap under, around,
and over tailboard sheave (11), and under, around and over A-frame sheave (5).
(10)
Turn pintle hook (17) so hook is on top, and secure hook end of cable (16)
to pintle hook
(17).
(11)
Turn side plates (12) and (4) back, screw in retaining pins (10) and (14),
and tighten nuts (13) and (15).
(12)
Hook U-bolt (18) over tailboard sheave bracket (19).
2-152
WARNING


Back to Top