TM-9-2320-361-10

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

OPERATOR'S MANUAL

DECEMBER 1988

  TM-9-2320-361-10 - Page 215 of 392

TM9-2320-361-10
2-31. OPERATION OF PIPELINE CONSTRUCTION
MAINTENANCE TRUCKS (Contd)
d. Lowering and Securing A-frame After Rear Operations.
(1)
Hook U-bolt (7) over tailboard sheave bracket (1).
(2)
Attach hook end of cable (2) to left center lashing ring (6).
(3)
Remove second chain (4) from bumperettes (5) and safety chains (3).
CAUTION
Do not let A-frame go past center (90°). It may free fall and
damage equipment.
(4)
Operate rear winch (refer to b. of this para.) to raise A-frame (8) to almost
vertical position (approximately 80°). Reset boom chains (9) to support
A-frame (8) in this position.
(5)
Remove hook end of cable (2) from lashing ring (6) and attach to pintle
hook (10). Leave about 2 feet of slack in cable (2).
2-154


Back to Top