2-31. OPERATION OF PIPELINE CONSTRUCTION
MAINTENANCE TRUCKS (Contd)
NOTE
Height of A-frame can be adjusted by making boom chains
longer or shorter. Position A-frame at higher angle for heavier
loads.
(13)
Take up slack in cable (16), and slowly operate winch (refer to b. of this
para.) until A-frame (20) reaches operating position. If necessary, manually push
A-frame (20) over center, until in operating position.
(14)
Fasten a second chain (22) to safety chains (21) and bumperettes (23) to
avoid backlash.
(15)
Let cable (16) go slack, unhook U-bolt (18) and lower until flush with
truck bed.
(16)
Remove hook end of cable (16) from pintle hook (17).
2-153