TM-9-2320-361-20

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

OCTOBER 1991

  TM-9-2320-361-20 - Page 692 of 1207

TM 9-2320-361-20
10-7. SPARE TIRE CARRIER MAINTENANCE
(Contd)
1. Install shaft (8) and ratchet (9) in housing (6) with new cotter pin (5).
2. Install ends of cable (7) through holes in shaft (8) and feed ends of cable (7) through hole in bottom
of housing (6).
NOTE
Ensure cable ends are of equal length through shaft.
3. Install two U-bolts (13) on pickup member (14) with four new lockwashers (11) and nuts (10). Do not
tighten nuts (10).
NOTE
Ensure cable ends extend through both U-bolts before tightening
nuts in step 4.
4. Install ends of cable (7) through holes in pickup member (14) and U-bolts (13). Tighten nuts (10).
Install spare tire carrier (2) on frame (4) with four screws (1) and new locknuts (3). Tighten locknuts (3)
30-35 lb-ft (41-47 NŽm).
FOLLOW-ON TASK: Install spare tire (TM 9-2320-361-10).
10-9


Back to Top