TM 9-2320-361-34
16-22. TRANSMISSION POWER TAKEOFF (PTO) COVER AND GASKET REPLACEMENT
THIS TASK COVERS:
a.
Removal
c. Installation
b.
Cleaning
INITIAL SETUP
APPLICABLE MODELS
All vehicles except M342A2
TOOLS
General mechanic’s tool kit
(Appendix B, Item 1)
MATERIALS/PARTS
Six lockwashers (Appendix F, Item 146)
Gasket (Appendix F, Item 77)
REFERENCES (TM)
TM 9-2320-361-10
TM 9-2320-361-34P
TM 9-2520-246-34P
LO 9-2320-209-12-1
EQUIPMENT CONDITION
●
Parking brake set (TM 2320-361-10).
●
Wheels chocked (TM 9-2320-361-10).
●
Transmission oil drained (LO 9-2320-209-12-1).
a. Removal
Remove six screws (5), lockwashers (4), cover (3), and gasket (2) from transmission power takeoff
(PTO) (1). Discard gasket (2) and lockwashers (4).
I
b. Cleaning
c. Installation
Clean mating surface between cover (3) and PTO (1).
Install new gasket (2) and cover (3) on PTO (1) with six new lockwashers (4) and screws (5).
FOLLOW-ON TASK: Fill transmission to proper fluid level (LO 9-2320-209-12-1).
16-100