TM 9-2320-365-34-2
18-50
Change 2
18-4.
DIGITIZATION KIT INITIAL INSTALLATION (CONT)
(145) Position circuit breaker CB11 (173) on dashboard
(174).
(146) Match mark position of mounting hole locations
(175) in dashboard (174).
(147) Remove circuit breaker CB11 (173) from
dashboard (174).
(148) Drill four holes in dashboard (174) at hole
locations (175).
(149) Drill two holes, one inch to left and right of hole
locations (175) at locations (176).
(150)
Install circuit breaker CB11 (173) on dashboard
(174) with two screws (177).
(151)
Install terminal lug TL24 (178) on stud (179) with
washer (180) and nut (181).
(152)
Install dust boot (182) on stud (179).
(153) Install terminal lug TL23 (183) on stud (184) with
washer (185) and nut (186).
(154) Install dust boot (187) on stud (184).
WARNING
Wear appropriate eye protection when
drilling holes.
Failure to comply may
result in injury to personnel.