TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 442 of 1616

TM 9-2320-440-13&P
0042-4
0042
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
END OF WORK PACKAGE
OUTRIGGER STABILIZERS DO NOT EXTEND (CONTINUED)
THAAD0662A
Step 5.
Connect pressure gage to test port TP13. Start engine (
Check
pressure at test port TP13, while attempting to operate outriggers (WP 0013). Shut off
engine (
Disconnect pressure gage.
a.
If 3,000 psi (20,684 kPa) is not measured, replace outrigger control
valve (WP 0142).
b.
If 3,000 psi (20,684 kPa) is measured, replace left outrigger stabilizer
cylinder (WP 0144).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
TM 9-2320-347-10)
TM 9-2320-347-10)


Back to Top