TM 9-2320-440-13&P
0123-3/(4 blank)
0123
4.
Coat threads on both ends of two nipples (2 and 4) with pipe thread sealing compound.
5.
Install nipple (2) on elbow (3).
6.
Install nipple (4) on hydraulic reservoir (5).
NOTE
Install elbow as noted prior to removal.
7.
Install elbow (3) on nipple (4).
8.
Install strainer (1) on nipple (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install hydraulic reservoir top plate and gasket (WP 0124).
2.
Fill hydraulic reservoir (WP 0120).
3.
Check hydraulic reservoir for leaks (
END OF TASK
END OF WORK PACKAGE
TM 9-2320-347-10)