TM-9-2330-202-13-P

TRAILER, CARGO, 3/4-TON, 2-WHEEL: M101A1, M101A2 AND M101A3; TRAILER, CHASSIS, 3/4-TON, 2-WHEEL: M116A1 AND M116A2; TRAILER, CHASSIS, 1-TON, 2-WHEEL: M116A3

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

DECEMBER 2011

  TM-9-2330-202-13-P - Page 149 of 552

Table
1.
Operator Preventive Maintenance Checks and Services (PMCS) for the
M101 and M116 Series Trailers - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
9
Before
Side Rack
Assembly
(M101A2 and
M101A3)
a. Check for missing or unserviceable bow clips
(Figure 4, Item 1).
b. Check for unserviceable stakes (Figure 4, Item 4).
c. Check for unserviceable slats (Figure 4, Item 3).
d. Check for missing or unserviceable strap hinge
assemblies (Figure 4, Item 2).
1
2
3
4
M116_M101_025
Figure 4.
Slide Rack Assembly Check.
TM 9-2330-202-13&P
0032
0032-5


Back to Top