Table
1.
Operator Preventive Maintenance Checks and Services (PMCS) for the
M101 and M116 Series Trailers - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
10
Before
Front Support
Leg
With trailer coupled to prime mover, check front support
leg (Figure 5, Item 1) for ease of operation.
Front support leg will not
secure in stowed position
or will not support trailer.
1
M116_M101_026
Figure 5.
Front Support Leg Check.
11
Before
Stoplight
Taillights
NOTE
An assistant is required while checking
stoplight taillights.
a. Connect intervehicular cable to prime mover
(WP
0005).
b. Operate prime mover light switch through all settings
and check stoplight taillights (WP
0002).
12
During
Trailer Operation
a. Be alert for any unusual noise while towing trailer. Stop
and investigate any unusual noises.
b. Make sure trailer is tracking correctly behind prime
mover, with no side pull.
13
Weekly
Wheel Assembly Check for proper tire pressure when tires are cool
(WP
0002).
One tire is flat, missing,
or unserviceable.
TM 9-2330-202-13&P
0032
0032-6


Back to Top