Table
1.
Operator Preventive Maintenance Checks and Services (PMCS) for the
M101 and M116 Series Trailers - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
14
Weekly
Reflectors
On cargo trailers, check for damage and presence of
reflectors (WP
0002).
15
Monthly
Frame
When trailer is loaded, inspect entire chassis frame
(Figure 6, Item 1) for damage, cracks, and broken welds.
Frame is broken
or cracked.
1
M116_M101_027
Figure 6.
Chassis Frame Inspection.
END OF TASK
END OF WORK PACKAGE
TM 9-2330-202-13&P
0032
0032-7/8 blank