TM-9-2330-202-13-P

TRAILER, CARGO, 3/4-TON, 2-WHEEL: M101A1, M101A2 AND M101A3; TRAILER, CHASSIS, 3/4-TON, 2-WHEEL: M116A1 AND M116A2; TRAILER, CHASSIS, 1-TON, 2-WHEEL: M116A3

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST

DECEMBER 2011

  TM-9-2330-202-13-P - Page 329 of 552

INSTALLATION - Continued
7.
Insert eight square neck bolts (Figure 2, Item 7), clamps (Figure 2, Item 8), and new self-locking nuts
(Figure 2, Item 9) into cargo body (Figure 2, Item 3).
8.
Torque 18 self-locking nuts (Figure 2, Items 6, 9, 10, 14, and 15) between 26 – 31 lb-ft (35 – 42 N•m).
9.
Remove lifting device from cargo body (Figure 2, Item 3).
1
2
3
3
3
4
5
5
5
6
7
8
9
10
11
12
13
14
15
M116_M101_4-112
Figure 2.
Cargo Body Installation.
END OF TASK
END OF WORK PACKAGE
TM 9-2330-202-13&P
0067
0067-3/4 blank


Back to Top