TM 9-2330-247-14&P
4-47. DRAWBAR COUPLER (Con’t)
ACTION
LOCATION
ITEM
REMARKS
3.
Frame (4)
Drawbar
a.
coupler (5)
b.
c.
INSTALLATION
4.
5.
Drawbar
coupler (5)
6.
Drawbar
coupler (5)
and nut (2)
Drawbar coupler
a.
(5)
b.
Note position of drawbar coupler (5) for instal-
lation.
Using hammer and brass drift, tap out.
If drawbar coupler (5) does not come out, using
torch, heat frame (4) surrounding drawbar cou-
pler, then repeat step 3b.
Coat drawbar coupler journal with grease.
Put in place and tap in with hammer.
Washer (3)
Screw in and tighten using 1X in. socket and handle
and nut (2)
with
~ in. drive. Torque nut (2) to 400-450 Ib.-ft.
(542-610 N•m) using torque wrench.
Ensure that hole for cotter pin (1) is open.
Cotter pin (1)
Put in place and bend using pliers.
TASK ENDS HERE
4-107