TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 84 of 540

TM 9-2330-326-14&P
6-8
General Procedure (Cont.):
b. Installation.
1.
Install blackout light (1), two new lockwashers (2), and two nuts (3).
2.
Apply dielectric grease on pins and then connect two connectors.


Back to Top