TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 88 of 540

TM 9-2330-326-14&P
6-12
b. Installation.
1. Install taillight (1) with three new self-tapping screws (2). Use a light coat of antiseize compound
on screws.
2. Connect ground wire to taillight.
3. Connect taillight connector to wiring harness connector behind bulkhead. Use dielectric grease
on pins.
c.
Follow-On Tasks.
1. Connect semitrailer to prime mover.
2. Raise landing legs.
3. Remove/store chocks and ground boards.
4. Connect power source and check to see if operational.


Back to Top