TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 89 of 540

TM 9-2330-326-14&P
6-13
6-5. RECEPTACLE CONVERTER BOX.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Tasks
Initial Setup:
Tools and Special Tools:
Materials:
Tool kit, general mechanic’s (item 4, Appendix B-3)
Dielectric grease (item 34, Appendix F)
Equipment Conditions:
References:
Landing legs down
Appendix G
Trailer disconnected from prime mover
Electrical Schematic, Section 6, Page 6-6
Tires chocked
Ground boards emplaced
WARNING
Disconnect all electrical power before performing any maintenance
on the electrical system. Failure to do so could result in injury.
CAUTION
To avoid damage to the semitrailers converter box and
electrical system either the 12 volt (7 pin)
OR
the 24 volt (12
pin) cable must be plugged into a converter box receptacle.
Never plug
both
intervehicular cables into the semitrailers
converter box, only one or the other -
NOT
both. The
converter box allows either 12 volts
OR
24 volts to be utilized
from the tractor, not both at the same time.
NOTE
For
detailed
procedures
and/or
information
see
referenced
Appendix G.
General Procedure:
a. Removal.
1. Remove four screws (3) and pull out receptacle converter box (2) as a unit.
2. Disconnect harness (1) from receptacle converter box (2).
NOTE
Repair procedures for the receptacle converter box are located in
Appendix G.


Back to Top