TM-9-2330-326-14-P

SEMITRAILER, TACTICAL, DROP DECK BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, M871A3

TECHNICAL MANUAL; OPERATOR’S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

FEBRUARY 2006

  TM-9-2330-326-14-P - Page 97 of 540

TM 9-2330-326-14&P
6-21
7.
Install S-camshaft (1), snap ring (7) and new retaining ring (8).
c.
Follow-On Tasks.
1.
Install brake shoes (para. 6-8).
2.
Install brake drum (para. 6-9).
3.
Install tire and wheel (para. 6-18).
4.
Remove jack stands from axles.
5.
Connect semitrailer to prime mover.
6.
Road test to check for safe operation.


Back to Top