0053-3/(4 blank)
TM 9-2330-335-14&P
0053
INSTALLATION
00053
WARNING
Ensure retaining hardware is present and serviceable. Failure to comply may result in injury to
personnel.
1.
Install two corner stakes (Figure 1, Item 2) using links (Figure 1, Item 3), new rivets (Figure 1, Item 4), and
lanyards (Figure 1, Item 5).
2.
Install 15 side stakes (Figure 1, Item 1) using links (Figure 1, Item 8), new rivets (Figure 1, Item 6), and lanyards
(Figure 1, Item 7).
END OF TASK
FOLLOW-ON TASKS
00053
1.
Install side/rear/front panels.
2.
Ensure all stakes and panels are secured.
3.
Connect semitrailer to prime mover.
4.
Remove/store chocks and ground boards.
5.
Raise landing legs.
END OF TASK
END OF WORK PACKAGE