TM-9-2330-335-14-P

SEMITRAILER, TACTICAL, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, RESET M871R, M871A1R AND M871A2R

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE MANUAL (INCLUDES REPAIR PARTS AND SPECIAL TOOLS LIST)

SEPTEMBER 2008

  TM-9-2330-335-14-P - Page 257 of 640

0051-1
TM 9-2330-335-14&P
0051
ORGANIZATIONAL MAINTENANCE
-
GROUND BOARDS REPLACEMENT
Removal, Installation
WARNING
Watch hands and fingers when removing/installing ground boards. Hands/fingers could be pinched
or cut if not careful when removing/installing ground boards.
NOTE
There are two ground boards and they are removed and installed the same way. This procedure
covers one ground board.
REMOVAL
00051
1.
Remove two cotter pins (Figure 1, Item 1), washers (Figure 1, Item 2), and pin (Figure 1, Item 3) from
semitrailer bracket. Discard cotter pins.
2.
Remove clip (Figure 1, Item 4) and chain link (Figure 1, Item 5) from chain and remove ground board (Figure 1, Item 6)
from semitrailer.
Figure 1.
Ground Boards.
051
END OF TASK
INITIAL SETUP
Maintenance Level
0
Organizational
0
Tools and Special Tools
0
Tool kit, general mechanic’s (Item 4, WP 0082)
0
Materials/Parts
0
Cotter pin (4)
0
Equipment Conditions
0
Landing legs down
0
Semitrailer disconnected from prime mover
0
Tires chocked
0
447-0073
2


Back to Top