TM 9-2330-335-14&P
0050-6
0050
INSTALLATION - CONTINUED
NOTE
Step 9 applies only to the M871R and M871A1R semitrailers.
9.
Install two brackets (Figure 4, Item 2), four screws (Figure 4, Item 4), eight washers (Figure 4, Item 3), and four new self-
locking nuts (Figure 4, Item 5).
Figure 4.
Brackets (M871R and M871A1R Only).
050
END OF TASK
FOLLOW-ON TASKS
00050
1.
Lubricate with 10-wt. oil.
2.
Retract/extend landing legs to ensure smooth operation.
3.
Emplace ground boards.
4.
Lower landing legs.
5.
Remove jack stands.
6.
Connect semitrailer to prime mover.
7.
Raise landing legs.
8.
Remove/store chocks and ground boards.
END OF TASK
END OF WORK PACKAGE
447-0201