TM-9-2330-335-14-P

SEMITRAILER, TACTICAL, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, RESET M871R, M871A1R AND M871A2R

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE MANUAL (INCLUDES REPAIR PARTS AND SPECIAL TOOLS LIST)

SEPTEMBER 2008

  TM-9-2330-335-14-P - Page 247 of 640

0048-3/(4 blank)
TM 9-2330-335-14&P
0048
ASSEMBLY
00048
1.
Connect sections of spare tire carrier (Figure 1, Item 12) and install three screws (Figure 1, Item 13) and new
self-locking nuts (Figure 1, Item 14).
2.
Install chain (Figure 1, Item 6) in spare tire carrier (Figure 1, Item 12).
END OF TASK
INSTALLATION
00048
1.
Position and support spare tire carrier (Figure 1, Item 12).
2.
At two outside brackets (Figure 1, Item 9), install four washers (Figure 1, Item 7), screws (Figure 1, Item 8), new
lockwashers (Figure 1, Item 11), and nuts (Figure 1, Item 10).
3.
At inside bracket (Figure 1, Item 3), install two washers (Figure 1, Item 4), screws (Figure 1, Item 5), new lockwashers
(Figure 1, Item 2), and nuts (Figure 1, Item 1).
END OF TASK
FOLLOW-ON TASKS
00048
1.
Install spare tire (WP 0022).
2.
Connect semitrailer to prime mover.
3.
Raise landing legs.
4.
Remove/store chocks and ground boards.
END OF TASK
END OF WORK PACKAGE


Back to Top