0052-3/(4 blank)
TM 9-2330-335-14&P
0052
INSTALLATION
00052
1.
Install bulkhead (Figure 2, Item 1), four bolts (Figure 2, Item 5), washers (Figure 2, Item 6), and new self-
locking nuts (Figure 2, Item 7).
2.
Install four nut/plates (Figure 1, Item 2), new lockwashers (Figure 1, Item 3), and bolts (Figure 1, Item 4).
3.
Remove lifting device from bulkhead (Figure 1, Item 1).
END OF TASK
FOLLOW-ON TASKS
00052
1.
Install manifest box (WP 0058).
2.
Connect semitrailer to prime mover.
3.
Raise landing legs.
4.
Remove/store chocks and ground boards.
5.
Install conspicuity tape (WP 0064).
END OF TASK
END OF WORK PACKAGE