TM-9-2330-335-14-P

SEMITRAILER, TACTICAL, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, RESET M871R, M871A1R AND M871A2R

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE MANUAL (INCLUDES REPAIR PARTS AND SPECIAL TOOLS LIST)

SEPTEMBER 2008

  TM-9-2330-335-14-P - Page 261 of 640

0052-3/(4 blank)
TM 9-2330-335-14&P
0052
INSTALLATION
00052
1.
Install bulkhead (Figure 2, Item 1), four bolts (Figure 2, Item 5), washers (Figure 2, Item 6), and new self-
locking nuts (Figure 2, Item 7).
2.
Install four nut/plates (Figure 1, Item 2), new lockwashers (Figure 1, Item 3), and bolts (Figure 1, Item 4).
3.
Remove lifting device from bulkhead (Figure 1, Item 1).
END OF TASK
FOLLOW-ON TASKS
00052
1.
Install manifest box (WP 0058).
2.
Connect semitrailer to prime mover.
3.
Raise landing legs.
4.
Remove/store chocks and ground boards.
5.
Install conspicuity tape (WP 0064).
END OF TASK
END OF WORK PACKAGE


Back to Top