TM-9-2330-335-14-P

SEMITRAILER, TACTICAL, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, RESET M871R, M871A1R AND M871A2R

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE MANUAL (INCLUDES REPAIR PARTS AND SPECIAL TOOLS LIST)

SEPTEMBER 2008

  TM-9-2330-335-14-P - Page 337 of 640

0071-5/(6 blank)
TM 9-2330-335-14&P
0071
INSTALLATION - CONTINUED
10. Torque suspension nuts to the following in-service DRY torque values:
1-1/8 in.- 12 UNF. . . . . . . . 880 lb-ft (1,193 Nm)
3/4 in.- 16 UNF . . . . . . . . . . .300 lb-ft (407 Nm)
5/8 in.- 18 UNF . . . . . . . . . . .180 lb-ft (244 Nm)
11. New replacement installations/hardware should have WET (oiled) fasteners. The following wet torque values apply:
1-1/8 in.- 12 UNF. . . . . . . . . .670 lb-ft (908 Nm)
3/4 in.- 16 UNF . . . . . . . . . . .228 lb-ft (298 Nm)
5/8 in.- 18 UNF . . . . . . . . . . .130 lb-ft (176 Nm)
END OF TASK
FOLLOW-ON TASKS
00071
1.
Align axles (WP 0111).
2.
Install hubs and brake drums (WP 0033).
3.
Install tires and wheels (WP 0021).
4.
Connect semitrailer to prime mover.
5.
Raise landing legs.
6.
Road test to ensure safe operation and tracking of axles.
END OF TASK
END OF WORK PACKAGE


Back to Top