0071-5/(6 blank)
TM 9-2330-335-14&P
0071
INSTALLATION - CONTINUED
10. Torque suspension nuts to the following in-service DRY torque values:
1-1/8 in.- 12 UNF. . . . . . . . 880 lb-ft (1,193 Nm)
3/4 in.- 16 UNF . . . . . . . . . . .300 lb-ft (407 Nm)
5/8 in.- 18 UNF . . . . . . . . . . .180 lb-ft (244 Nm)
11. New replacement installations/hardware should have WET (oiled) fasteners. The following wet torque values apply:
1-1/8 in.- 12 UNF. . . . . . . . . .670 lb-ft (908 Nm)
3/4 in.- 16 UNF . . . . . . . . . . .228 lb-ft (298 Nm)
5/8 in.- 18 UNF . . . . . . . . . . .130 lb-ft (176 Nm)
END OF TASK
FOLLOW-ON TASKS
00071
1.
Align axles (WP 0111).
2.
Install hubs and brake drums (WP 0033).
3.
Install tires and wheels (WP 0021).
4.
Connect semitrailer to prime mover.
5.
Raise landing legs.
6.
Road test to ensure safe operation and tracking of axles.
END OF TASK
END OF WORK PACKAGE