TM-9-2330-335-14-P

SEMITRAILER, TACTICAL, BREAKBULK/CONTAINER TRANSPORTER, 22-1/2 TON, RESET M871R, M871A1R AND M871A2R

TECHNICAL MANUAL; FIELD AND SUSTAINMENT MAINTENANCE MANUAL (INCLUDES REPAIR PARTS AND SPECIAL TOOLS LIST)

SEPTEMBER 2008

  TM-9-2330-335-14-P - Page 344 of 640

TM 9-2330-335-14&P
0072-6
0072
FOLLOW-ON TASKS
00072
1.
Align axles (WP 0111).
2.
Install hubs and brake drums (WP 0033).
3.
Install tires and wheels (WP 0021).
4.
Connect semitrailer to prime mover.
5.
Raise landing legs.
6.
Road test to ensure safe operation and tracking of axles.
END OF TASK
END OF WORK PACKAGE


Back to Top