TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 1029 of 1348

FIELD MAINTENANCE
GENERAL DISASSEMBLY INSTRUCTIONS
INITIAL SETUP:
Not Applicable
CLEANLINESS
Work area must be as clean as possible to prevent contamination to components.
END OF TASK
LOCKING PARTS
CAUTION
Self-locking fasteners that are loosened must be replaced, not tightened.
Replace all lockwire, lockwashers, cotter pins, and locknuts at time of reassembly.
END OF TASK
EXPENDABLE PARTS
All gaskets, packings, and seals removed during repair must be discarded and replaced with new parts.
END OF TASK
REMOVING SEALS
Be sure all traces of oil, gaskets, and sealants are removed from components. When possible, use wood or plastic
probes and scrapers to prevent damage to machined surfaces.
END OF TASK
PARTS PROTECTION
CAUTION
Do not use tape to close off oil openings. Sticky surface of tape can mix with oil and cause
malfunctions.
To keep dust, dirt, moisture, and other objects out of internal parts of systems or components, cap or tape over all
open tubes, hoses, fittings, air lines, and component openings as soon as part is removed. Wrap all removed parts
in clean paper or dip parts in preservation oil.
END OF TASK
END OF WORK PACKAGE
TM 9-2330-342-23&P
0128
0128-1/2 blank


Back to Top