TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 630 of 1348

INSTALLATION - Continued
1
2
6
5
4
3
Figure 10.
Air Reservoir No. 1 Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Charge air system (TM 9-2330-342-10). (WP
0190)
2.
Check for air leaks. (WP
0047)
3.
Remove wheel chocks (TM 9-2330-342-10). (WP
0190)
END OF TASK
END OF WORK PACKAGE
TM 9-2330-342-23&P
0068
0068-8


Back to Top