TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 651 of 1348

INSTALLATION - Continued
Table
2.
Axle Air Lines.
Axle
Left Side
Right Side
Service Port
Spring Port
Service Port
Spring Port
1
2547
2023
2545
2022
2
2015
2139
2017
2138
3
2016
2141
2018
2140
9.
Install two air lines (Figure 9, Item 1) and (Figure 9, Item 4) on fittings (Figure 9, Item 2) and (Figure 9, Item
3).
2
4
3
1
Figure 9.
Brake Chamber Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Uncage brake (TM 9-2330-342-10). (WP
0190)
2.
Adjust brakes (TM 9-2330-342-10). (WP
0190)
3.
Charge air system (TM 9-2330-342-10). (WP
0190)
4.
Check for air leaks. (WP
0047)
5.
Remove wheel chocks (TM 9-2330-342-10). (WP
0190)
END OF TASK
END OF WORK PACKAGE
TM 9-2330-342-23&P
0071
0071-7/8 blank


Back to Top