INSTALLATION - Continued
2
4
6
7
8
9
10
11
5
3
12
13
1
Figure 7.
Air Reservoir No. 3 Installation.
16.
Install fitting (Figure 7, Item 12) on air reservoir (Figure 7, Item 7).
17.
Apply sealing compound on threads of drain valve (Figure 7, Item 4).
18.
Install drain valve (Figure 7, Item 4) and cable (Figure 7, Item 8) on air reservoir (Figure 7, Item 7).
19.
Install air lines 2080 (Figure 7, Item 11) and 2014 (Figure 7, Item 5) on fitting (Figure 7, Item 10) and fitting
(Figure 7, Item 6).
20.
Install air line 2606 (Figure 7, Item 9) on fitting (Figure 7, Item 12).
21.
Install air line 2606 (Figure 7, Item 9) on crossmember (Figure 7, Item 2) with clamp (Figure 7, Item 3), screw
(Figure 7, Item 1) and locknut (Figure 7, Item 13).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Charge air system (TM 9-2330-342-10). (WP
0190)
2.
Check for air leaks. (WP
0047)
TM 9-2330-342-23&P
0070
0070-6