TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 866 of 1348

CLEANING/INSPECTION - Continued
1
2
Figure 8.
Drawbar Lifting Handle/Tow Ring/Adjusting Pin Cleaning/Inspection.
6.
Inspect tow ring bracket (Figure 8, Item 1) for bent or gouged lip.
7.
Replace damaged parts.
END OF TASK
INSTALLATION
NOTE
Perform Step (1) if locking gate was removed.
1.
Install locking gate (Figure 9, Item 6) on drawbar (Figure 9, Item 4) with roll pin (Figure 9, Item 5).
1
2
3
4
5
6
Figure 9.
Drawbar Lifting Handle/Tow Ring/Adjusting Pin Installation.
2.
Install adjusting pin (Figure 9, Item 1) on drawbar (Figure 9, Item 4).
3.
Install chain (Figure 9, Item 3) on drawbar (Figure 9, Item 4) with cotter pin (Figure 9, Item 2).
4.
Install chain (Figure 10, Item 2) on adjusting pin (Figure 10, Item 4) with cotter pin (Figure 10, Item 1).
TM 9-2330-342-23&P
0102
0102-8


Back to Top