TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 941 of 1348

REFLECTOR REPLACEMENT (REAR RED)
NOTE
Both reflectors are removed and installed the same way.
REMOVAL
Remove two locknuts (Figure 3, Item 6), self-tapping screws (Figure 3, Item 1), bracket (Figure 3, Item 2),
reflector (Figure 3, Item 3), and gasket (Figure 3, Item 4) from trailer (Figure 3, Item 5). Discard locknuts.
5
6
4
3
2
1
Figure 3.
Reflector Replacement (Rear Red).
INSTALLATION
Install gasket (Figure 3, Item 4), reflector (Figure 3, Item 3), bracket (Figure 3, Item 2), two self-tapping screws
(Figure 3, Item 1), and locknuts (Figure 3, Item 6) on trailer (Figure 3, Item 5).
END OF TASK
REFLECTOR BRACKET REPLACEMENT
NOTE
Both brackets are removed and installed the same way.
REMOVAL
Remove two locknuts (Figure 4, Item 3), self-tapping screws (Figure 4, Item 1), and mounting bracket (Figure
4, Item 4) from trailer (Figure 4, Item 2). Discard locknuts.
TM 9-2330-342-23&P
0113
0113-3


Back to Top