REMOVAL - Continued
2.
Remove four screws (Figure 1, Item 4) and locknuts (Figure 1, Item 6) from fire extinguisher bracket (Figure
1, Item 2) and stowage box (Figure 1, Item 3). Discard locknuts.
3.
Remove two screws (Figure 1, Item 1) and locknuts (Figure 1, Item 7) from fire extinguisher bracket (Figure
1, Item 2) and stowage box (Figure 1, Item 3). Discard locknuts.
4.
Remove fire extinguisher bracket (Figure 1, Item 2) from stowage box (Figure 1, Item 3).
5.
Remove six locknuts (Figure 2, Item 6), screws (Figure 2, Item 7), and stowage box (Figure 2, Item 5) from
brackets (Figure 2, Item 1). Discard locknuts.
1
2
3
4
4
1
5
6
7
Figure 2.
Stowage Box Removal.
NOTE
Perform Step (6) if brackets are damaged.
6.
Remove six locknuts (Figure 2, Item 2), screws (Figure 2, Item 4), and two brackets (Figure 2, Item 1) from
trailer (Figure 2, Item 3). Discard locknuts.
END OF TASK
DISASSEMBLY
1.
Remove eight locknuts (Figure 3, Item 2), screws (Figure 3, Item 8), and door (Figure 3, Item 7) from stowage
box (Figure 3, Item 1)