TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 951 of 1348

DISASSEMBLY - Continued
2
3
4
5
6
7
8
1
Figure 3.
Stowage Box Disassembly.
2.
Remove six locknuts (Figure 3, Item 3), screws (Figure 3, Item 5), and water guard (Figure 3, Item 4) from
stowage box (Figure 3, Item 1). Discard locknuts.
NOTE
Perform Step (3) only if door seal is damaged.
3.
Remove door seal (Figure 3, Item 6) from stowage box (Figure 3, Item 1). Discard door seal.
END OF TASK
CLEANING/INSPECTION
1.
Visually inspect box for obvious cracks or damage that would impair operation.
2.
Remove dirt and mud from inside box.
END OF TASK
ASSEMBLY
NOTE
Perform Steps (1) and (2) if door seal was removed.
1.
Coat new door seal (Figure 4, Item 6) with adhesive.
TM 9-2330-342-23&P
0115
0115-3