TEST EQUIPMENT SETUP FOR PRESSURE TEST 49, 50 AND 51 - Continued
TK PRESSURE
TRANSDUCER
W4 CABLE
W4 CABLE
J2/J3
CONNECTORS
ICE BOX
J6
CONNECTOR
P1
CONNECTOR
CABLE P1
CONNECTOR
J6 CONNECTOR
Figure 3.
ICE Box Setup for Pressure Test.
3. Connect other end of W4 cable to J2/J3 connector on ICE BOX.
4. Connect cable P1 connector to J6 connector on ICE BOX.
CAUTION
If removing PCMCIA card, ensure PCMCIA drive is properly shutdown through Eject
Hardware icon on lower right side of desktop screen toolbar or by shutting down
Maintenance Support Device (MSD). Failure to comply may result in damage to
PCMCIA card.
5. Connect cable P2 connector to PCMCIA card.
CABLE P2 CONNECTOR
(WITH PCMCIA CARD INSIDE)
MAINTENANCE
SUPPORT DEVICE (MSD)
Figure 4.
MSD PCMCIA Card Setup.
6. Insert PCMCIA card into MSD PCMCIA slot.
TM 9-2330-342-23&P
0004
0004-4