TM 9-2350-238-20- 2
2-55. MAINTENANCE OF BOOM AN D
(CONT) .
WINCH AND MANUAL CONTROL LEVE R
INSTALLATIO N
1
Install manual control lever (1), four ne w
Iockwashers (2), and four machine bolts
(3) to vehicle tow drum winch (4) .
2
Install headed straight pin (5), flat washe r
(6), and new cotter pin (7) securin g
manual control lever (1) to winch shift ro d
(8) .
2-17 6