TM-9-2350-238-20-2

CRANE (CAB) COMPONENTS RECOVERY VEHICLE, FULL TRACKED: LIGHT,ARMORED, M578

TECHNICAL MANUAL; UNIT MAINTENANCE MANUAL

MAY 1993
CHANGE 1

  TM-9-2350-238-20-2 - Page 219 of 495

TM 9-2350-238-20- 2
INSTALLATION
1
Install two new preformed packings (1 )
and connect two counterbalance manifol d
metallic tube assemblies (2) to manifol d
assembly counterbalance (3) .
2
Install two new preformed packings (4) ,
two new preformed packings (5), tw o
boom cylinder control line flange adapters
(6), four split-flange clamp halves (7) ,
eight new Iockwashers (8), and eight hex-
agon head capscrews (9) connecting tw o
counterbalance manifold metallic tub e
assemblies (2) to two elbow to adapter
metal tube assemblies (10 and 11) .
3
Install two new preformed packings (12 )
and connect two three-spool valve meta l
tube assemblies (13 and 14) to three-
spool valve (15) .
4
Secure two three-spool valve metal tub e
assemblies (13 and 14) to three-spoo l
valve (15) using four split-flange clam p
halves (16), eight new Iockwashers (17) ,
and eight hexagon head capscrews (18) .
2-17 9


Back to Top