TM-9-2350-256-10

RECOVERY VEHICLE, FULL TRACKED: MEDIUM, M88A1

OPERATOR'S MANUAL

OCTOBER 2014

  TM-9-2350-256-10 - Page 596 of 796

Table 1.
Operator Preventive Maintenance Checks and Services (PMCS) – Monthly - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE IF:
22
MONTHLY
25-Ton and
90-Ton Snatch
Blocks
1. Lubricate 25-ton snatch block through fitting until
grease is visible (WP 0101).
2. Remove pins from 90-ton snatch blocks. Lubricate
pins with grease (WP 0101).
Rusted or frozen pin or
pulley.
3. Insert pins into 90-ton snatch blocks.
4. Lubricate 90-ton snatch blocks through fittings until
grease is visible (WP 0101).
Figure 23.
25-Ton and 90-Ton Snatch Blocks.
23
MONTHLY
Boom Pulley
Shaft
Lubricate pulley shaft through fitting until grease is
visible (WP 0101).
TM 9-2350-256-10
0100
0100-14


Back to Top