TM-9-2350-260-20-1-2

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 2 OF 4, CHAPTERS 5 THRU 9

  TM-9-2350-260-20-1-2 - Page 111 of 772

TM 9-2350-260-20-1-2
ENGINE OIL LEVEL GAGE CAP REPLACEMENT (2A ENGINE) (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
6-34
Installation
6-36
TOOLS:
3/8 in. combination box and open end wrench
1/2 in. socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
Ratchet with 1/2 in. drive
SUPPLIES:
Gasket (10935621)
Preformed pacing (MS28775-327) (2 required)
Lockwasher (MS90726-31) (2 required)
PRELIMINARY PROCEDURE:
Remove powerplant (page 5-2)
REMOVAL:
1.
Open cap assembly (A) and remove oil level gage.
2.
Using 3/8 inch wrench, disconnect fuel drain tubes
(B) from valves (C).
3.
Open straps (D) and remove fuel drain hoses (E).
4.
Using 1/2 inch socket, remove two screws (F)
securing valves (C) and bracket (G).
5.
Remove bracket (G), valves (C), and hoses (E) as
a unit from engine.
Go on to Sheet 2
TA147488
6-34


Back to Top