TM 9-2350-260-20-1-2
ENGINE OIL LEVEL GAGE CAP REPLACEMENT (2D ENGINE) (Sheet 1 of 3)
TOOLS:
1/2 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
SUPPLIES:
Gasket (10935621)
Lockwasher (7410218) (2 required)
PRELIMINARY PROCEDURES:
Remove powerplant (page 5-27)
Remove engine shroud (page 9-2)
REMOVAL:
1.
Using socket, remove four screws and washers
(A) securing plate with electrical connectors (B).
2.
Position plate with electrical connectors (B) aside.
Go on to Sheet 2
TA147492
6-38