TM 9-2350-260-20-1-2
OIL FILLER TUBE AND HOSE (LOWER) REPLACEMENT (Sheet 2 of 2)
INSTALLATION:]
1.
Push hose (A) over tube assembly (B).
2.
Position clamp (C) over tube assembly (B) end of
hose (A).
3.
Using socket tighten nut of clamp (C).
4.
Place clamp (D) loosely over hose (A) with clamp
nut facing you.
5.
Place assembled parts (A) through (D) in position
on powerplant.
6.
Push end of hose (A) over upper tube end (E).
7.
Position new gasket (F) and tube assembly (B) on
powerplant port.
8.
Place new lockwashers (G) on three screws (H).
9.
Inset three screws (H) in flange of tube assembly
(B) and tighten finger tight.
10.
Using wrench, tighten screws (H).
11.
Position clamp (D) on hose (A) over end of upper
tube end (E).
12.
Using socket, tighten nut of clamp (D).
13.
Install 2A powerplant (page 5-14) or 2D
powerplant (page 5-40).
End of Task
TA147500
6-46