TM 9-2350-260-20-1-2
POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 17 of 28)
9.
Install six spring washers (A) (three on each side)
to top of transmission mounts.
10.
Using hoist with sling, lift powerplant into position
over engine compartment.
11.
Use personnel to guide powerplant into hull.
12.
Make sure transmission rollers (B) fit into both
powerplant guides (C).
13.
Lower powerplant into installed position.
When
powerplant is seated, remove both fabricated final
drive guide shields.
14.
Check that powerplant is correctly seated.
Check
all clearances around powerplant
15.
Remove four sling hooks from four lifting eyes of
powerplant.
Go on to Sheet 18
TA147943
5-42