TM 9-2350-260-20-1-2
POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 12 of 26)
CAUTION
Check all disconnected rod and line
ends, hoses, and cables to make sure
they will be out of the way during
powerplant removal.
33.
Connect hoist hook to sling.
Make sure hoist hook
is put through hole used to lift powerplant.
34.
Using hoist with sling, position sling over
powerplant so T-end is to front of tank.
35.
Attach four cable hooks of sling to four lifting eyes
on powerplant.
Make sure hook ends are toward
outside of tank
36.
Position personnel to guide powerplant as it is
hoisted out of tank.
Go on to Sheet 13
TA147938
5-37