TM 9-2350-260-20-1-2
POWERPLANT REPLACEMENT (2D ENGINE) (Sheet 15 of 28)
INSTALLATION:
1.
If not previously removed, remove fabricated tools
covering two final drive adapter assemblies (one
on each side of tank).
2.
Remove, clean, lubricate, and reinstall two final
drive adapter assemblies (page 12-9).
3.
Install two fabricated final drive guide shields (Fig.
1, Appendix F) (one on each side of tank) over two
final drive adapter assemblies.
4.
Apply light coat of grease (Item 36, Appendix D) to
powerplant mounting surfaces.
5.
Make sure hoist hook is in powerplant hole of sling
(Item 31, Chapter 3, Section I).
NOTE
T-end of sling should be toward front
(engine end of power-plant).
Go on to Sheet 16
TA147941
5-40