TM 9-2350-260-20-1-2
FUEL PRIMER INLET LINE TUBE ASSEMBLY REPLACEMENT (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
7-311
Cleaning and Inspection
7-313
Installation
7-313
TOOLS:
5/8 in. combination box and open end wrench (2 required)
7/16 in. combination box and open end wrench
7/16 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
11/16 in. combination box and open end wrench
SUPPLIES:
Rags (Item 65, Appendix D)
Lockwasher (MS35338-44) (3 required)
PRELIMINARY PROCEDURES:
Shut off el supply to primer pump
REMOVAL:
1.
Using 5/8 inch wrench, remove nut (A) from tee (B).
Move tube assembly (C) slightly away from tee.
Go on to Sheet 2
TA148386
7-311