TM-9-2350-260-20-1-2

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 2 OF 4, CHAPTERS 5 THRU 9

  TM-9-2350-260-20-1-2 - Page 63 of 772

TM 9-2350-260-20-1-2
2A ENGINE AND 2D ENGINE POWERPLANT TESTS (GROUND HOP) (Sheet 2 of 16)
TOOLS:
3/8 in. socket head screw key (allen wrench)
1/2 in. combination box and open end wrench
3/4 in. combination box and open end wrench
3/4 in. socket with 1/2 in. drive
Flat-tip screwdriver with 1/4 in. blade
Ratchet with 1/2 in. drive
Torque wrench with 1/2 in. drive (0-175 lb-ft) (0-237 N
m)
1-1/4 in. socket with 1/2 in. drive
Spanner wrench
Industrial goggles
SPECIAL TOOLS:
Ground hop kit (Item 30, Chapter 3, Section I)
FABRICATED TOOLS: Throttle linkage adjusting go/no-go gage (Fig. 3, Appendix F)
Engine air cleaner (2 required) (Fig. 4, Appendix F)
Tachometer (Fig. 2, Appendix F)
PERSONNEL:
Three
REFERENCE:
TM 9-2350-260-20-1-2
LO 9-23504260-12
PRELIMINARY PROCEDURE:
Remove powerplant (page 5-1)
NOTE
Tests can be performed in any order.
If more than one test is to be performed, do
not disconnect test hookup.
Disconnect test hookup only when test or tests are complete.
Go on to Sheet 3
5-53


Back to Top