TM 9-2350-260-20-1-3
GENERATOR ELECTRICAL LEADS REPLACEMENT (2D ENGINE)(Sheet 3 of 4)
INSTALLATION:
1.
Position electrical lead (A) on powerplant.
2.
Position
electrical
connector
(B)
in
engine
disconnect bracket (C).
3.
Using screwdriver and 3/8 inch wrench, install for
crews, new lockwashers, and nuts (D).
4.
Place four clamps (E) over electrical leads (A).
5.
Using 7/16 inch socket, install eight screws (F) and new lockwashers (G).
Go on to Sheet 4
TA147406
10-374