TM-9-2350-261-10

CARRIER, M113A2, M577A2, M1064, M1068, M1059 AND M901A1

OPERATOR'S MANUAL

  TM-9-2350-261-10 - Page 593 of 761

TM 9-2350-261-10
BREAK/JOIN T150 TRACK
0079 00
THIS WORK PACKAGE COVERS:
Break T150 Track (page 0079 00-1).
Join T150 Track (page 0079 00-5).
INITIAL SETUP:
Maintenance Level
Operator
Tools and Special Tools
C row bar ( WP 0 094 0 0, Table
2
, Item 11)
En d C on necto r Rem over ( WP 009 4 00, Tab le
2
, I tem 3 8)
G rease Gun (WP 009 4 00, Table
2
, Item 24)
Hamm er, 2 lb (W P 0094 00, Table
2
, Item 25)
or Hammer, 4 lb (WP 0095 00)
Handle Extension Wrench (WP 0094 00, Table
Handle, Socket Wrench, 3/4 inch drive (WP 0094 00,
Ta ble
2
, I tem 29)
Socket, 1-1/8 inch, 3/4 inch drive (WP 0094 00, Table
2
, Item 44)
Tool, Track Pin Alignment (2) (WP 0094 00, Table
2
, Item 54)
Track Fixture ( 2) (WP 0 094 0 0, Table
2
, Item 21)
Wrench, Adjustable, 1-5/16 inch (WP 0094 00, Table
2
, Item 57)
Industrial Goggles (WP 0095 00)
Personnel Required
Driver
Crew
References
DA 2404
DA 5988-E
WP 0026 00
WP 0028 00
WP 0029 00
WP 0050 00
WP 0077 00
Equipment Condition
Engine stopped (WP 0029 00)
BREAK T150 TRACK
1.
Unstow crowbar and track fixtures. Remove industrial goggles and hammer from tool bag.
007900-1
2
, Item
17
)


Back to Top